Skip to product information
1 of 3

Handy+Forms

A5 Size Project Planner, Sized and Punched for 6-Ring A5 Notebooks by Filofax, LV (GM), Kikki K, TMI, and Others. Sheet Size 5.83" x 8.27" (148mm x 210mm)

A5 Size Project Planner, Sized and Punched for 6-Ring A5 Notebooks by Filofax, LV (GM), Kikki K, TMI, and Others. Sheet Size 5.83" x 8.27" (148mm x 210mm)

Regular price $12.67 USD
Regular price Sale price $12.67 USD
Sale Sold out
Shipping calculated at checkout.

A practical pick for work, study, planning, and everyday desk routines.

Quantity

✓ Free standard shipping on eligible U.S. orders $59+.

✓ Secure checkout

✓ Support within 1–2 business days

✓ Please check size, color, quantity, and product details before ordering

About This

  • PLANNER PAGE SIZES FOR 6-RING NOTEBOOKS CAN BE CONFUSING. PLEASE CHECK THE IMAGES FOR A PLANNER PAGE SIZE COMPARISON TO BE SURE THIS PRODUCT WILL FIT YOUR NOTEBOOK.
  • Project planner and manager for A5 Size notebooks.
  • Simplifies project documentation of planning steps, tasks/actions, and milestones.
  • Punched with 2 groups of 3 holes spaced 3/4" (19mm) with 2-3/4" (70mm) between the groups to fit the popular 6-ring A5 size notebooks by Filofax, LV (GM), Kikki K, TMI, Quo Vadis, and others.
  • Page size is 5.83" x 8.27" (148mm x 210mm). Printed on exceptionally high quality heavy weight paper (120 gsm), with a silky-smooth writing surface. Does not bleed through. 50 sheets per pack.

Overview

  • Brand : Handy Forms
  • Color : Rose Madder
  • Cover Material : Paper
  • Year : 2020
  • Format : Organizer
  • Target Audience : Adult
  • Sheet Size : A5
  • Material : Paper
  • Binding : Unknown Binding
  • Product Dimensions : 5.83"L x 8.27"W
View full details

Why this product

A practical Deskery pick for making your workspace easier to use, organize, or enjoy during everyday routines.

Useful for daily routines

A simple option for work, study, planning, organization, or everyday desk use.

Easy to add to your setup

Designed to fit naturally into your current desk, study area, home office, or small workspace.

Chosen for practical use

Selected with simple, everyday desk needs in mind, from keeping things nearby to making routines easier to manage.

Before you order

Please review the product details carefully so you can choose the option that fits your desk, routine, and workspace.

1

Check the size

Review photos and size details to make sure the item fits your desk, drawer, shelf, planner, or workspace.

2

Check color and quantity

Colors, sets, and quantities may vary by option. Confirm your selected variant before checkout.

3

Check how you will use it

Choose the item that fits your routine, whether you are organizing, writing, planning, studying, or setting up a workspace.

4

Review shipping details

Shipping is calculated at checkout. Please review shipping and return information before placing your order.

Good to Know

How do I know if this item fits my desk or routine?

Please review the product photos, size details, option details, and quantity before ordering. This helps you choose an item that fits your desk, workspace, or daily routine.

Is this useful for work, study, or organization?

Many Deskery products are selected for everyday desk routines, including work, study, planning, writing, organization, and small workspace setup.

What should I check before checkout?

Please check size, color, quantity, material details if listed, included items, selected variant, and shipping information before placing your order.

Can I combine this with other Deskery items?

Yes. Many Deskery items are easy to mix and match with other desk accessories, organizers, planners, writing tools, and study essentials.

How can I get help with my order?

Contact us through our Contact Us page or email
support@deskerysupply.com. Please include your order number and the email address used at checkout. We aim to respond within 1–2 business days.

Keep exploring Deskery

Browse more desk essentials for work, study, planning, organization, and everyday routines.